top of page

EMPLOYMENT DEVELOPMENT 

Our intention is to deliver an exemplar sustainable development. 

​

All of the buildings will be designed to achieve zero operational carbon, be highly energy efficient and be among the most sustainable logistics buildings in the UK. 

ribbon_.png
working draft concept layout reduced.jpg

Working draft concept layout 

This will be achieved through the following means:

  • No fossil fuel connections to the site.

​​

  • Electricity will be sourced from on-site solar generation and will only be supplemented where necessary by grid based renewable suppliers. 

​​

  • Sustainable systems and products will be selected for the development, including solar PV panels, best in class VRF heat exchange systems, air and / or ground source heat pumps, solar water heating, PIR LED lighting and battery storage to allow use of stored solar energy during the night time.

​​

  • Highly insulated and airtight buildings. 

​​

  • Rainwater harvesting for non-potable uses (e.g. toilet flushing and landscape irrigation).

​​

  • Achieving BREEAM Outstanding and an EPC A+ rating.

bottom of page